industrial
cascade power plant
The Cascade Power Plant is a 900MW high-efficiency, combined cycle natural gas-fired generating facility. It will provide power for approximately 900 000 houses and businesses in Alberta. That's over 8% of the provinces average electrcity demand. This project is located 12 kilometers south-west of Edson Alberta and took four years to complete. (From 2020 to 2024).
MASS POURSWe are the proud concrete supplier of the Cascade Power Plant.Using both of our concrete batch plants our hardworking and dedicated team delivered 1258 Meters of concrete in one day!
Trans mountain pipeline expansion
The Trans Mountain Pipeline Expansion is a twinning of the existing pipeline that extends between Edmonton AB, and Burnaby BC. The expansion includes approximately:
- 980 kilometers of new pipeline
- 193 kilometers of re-activated pipeline
- 12 new pump stations
- 19 new tanks for storage
This will allow the pipeline system to nearly triple its nominal capacity from
300 000 to 890 000 barrels per day.
450 KILOMETERS
We supplied concrete for the Trans Mountain Pipeline Expansion from Mount Robson BC to Edmonton AB. Nearly 450 Kilometers!
middlesboro bridge replacement
The Middlesboro Bridge, located in Merritt was destroyed in the 2021 atmospheric river event. The replacement bridge being constructed from 2024 - 2025, will have a 68.5 Meter long span and will be built 1.5 Meters higher then the previous bridge, allowing a 65% increase in water volume. This new bridge will be double laned and have multi-use pathways for pedestrians and cyclists.